Modern Pentathlon Combined Hall for the Beijing 2008 Olympic Games
Construction location: Haidian District, Beijing. Completion time: 2008
The crowd is highly concentrated, and it is the peak period of people entering and leaving the hall. The operation is efficient, but it is operating at an overloaded state. The peak flow of people has a relatively large impact on the elevators in the hall. The reliability of the main components of the elevator has become a key element of the Olympic/Asian Games project. The hot backup design of the main control system of XJ Schindler, and the margin design of the drive system and the main engine with two enlarged gears, effectively ensure the smooth progress of the Olympic Games.